Window replacement at Sparta
AF Bostäder will carry out a window replacement project at Sparta 39 C during March and April 2025. The new windows are more energy-efficient and will improve the indoor climate for the students. Here, you can read more about the schedule, the scope of work, and the measures taken to minimize disruptions for the tenants.
Schedule
The window replacement will take place from March 10 to April 17, 2025. The work will be done corridor by corridor and is estimated to take approximately one week per corridor.
Scope
- The spring window replacement will take place on Tunavägen 39 C 1201–1426.
- All windows in the corridor rooms and the shared corridor kitchen will be replaced.
- As part of the window replacement, we will also carry out PCB and asbestos remediation.
Disruptions
Certain work activities may be noisy, especially at the beginning of the week. We kindly ask for your understanding regarding the temporary inconveniences this may cause and assure you that we are working to minimize disruptions as much as possible.
Project background
Sparta was built in the 1970s, which means the windows are now over 50 years old. Recently, we have received complaints from the students regarding the indoor climate and drafts from the windows. To address these issues and improve the quality of living, we will install new windows. The new windows are energy-efficient and will result in significant energy savings, while improving the indoor climate and reducing drafts.
Contact
If you have any questions regarding the project, please feel free to contact the Project Manager Peter Molin via email at peter.molin@afbostader.se or by phone at +46 (0) 46 19 15 41.